Town of Pearl River WWTP Upgrade
Pearl River, Louisiana

Client: Town of Pearl River
Project Size: 365,000 Gallons

Located in Pearl River, Louisiana, this project includes the installation of a 365,000 gallon aeration basin, two static screens, and sludge pumps with miscellaneous piipes, fittings, valves, etc.  Additional scope includes renovation of existing processing system.

The project also requires an addition to the existing control and chemical storage building.