Myriant AMS Tank & Truck / Barge Load-Out Facility Lake Providence, Louisiana

Client Myriant Lake Providence, Inc.
Size 1,000,000 Gallons

The Lemoine Company contracted with Myriant to design and build the Ammonia Sulfate storage and load out facility at their Succinic Acid Plant in Lake Providence. Our scope of work included a one million gallon storage tank, barge and truck load out pump and piping systems, and the truck load out facility which included load out platform, articulated loading arm, metering and measuring systems, gangway with extendable platform, and all related site improvements.