Healthcare Facilities
Contract Amount: $ 17,390,062
The five-story Crescent City Surgical Centre is a design-build project with WHLC Architecture. CCSC is a cast-in-place concrete structure with a parking garage on the first three floors and specialty surgical hospital on floors four and five. The parking garage will accommodate 147 parking spaces along with mechanical yard and storage rooms. The 4th floor contains admission and waiting areas, a CT room, an X-Ray room, break rooms, offices, and 20 patient rooms. The 5th floor contains eight Operating Rooms, pre-op holding areas, recovery areas, a doctor’s lounge, and procedure rooms. With a footprint of roughly 25,000 square feet, CCSC is being built on what once was a 36,000 square foot asphalt parking lot. The exterior façade of the structure will be a combination of masonry, stucco, metal panels, and curtain wall. The interior of the building will be composed of millwork, acoustical and hard ceilings, sheet vinyl and VCT flooring, ceramic tile, terrazzo, wall protection, and window treatments. With completion scheduled for the end of 2010, the doctors and staff are anxiously awaiting their new facility.
Contract Amount: $ 141,694,118
In 2007, a comprehensive site and facility master plan for the Our Lady of Lourdes Replacement Hospital Campus was proposed. Design for a new campus then began, as years of unplanned additions and renovations to the current location rendered hospital clinical areas obsolete and left no choice but to begin anew.
The six-floor, 389,000 square foot facility will house all acute care clinical services, will have 192 private patient rooms (168 of which will be built during the current phase and 24 of which will be shelled for future growth), and will rest on a 45-acre greenfield site. The replacement facility will be comprised of state-of-the-art acute care hospital, 1,500 parking spaces, a 16,000 square foot Central Energy Plant designed for future growth, and will be structurally engineered for future expansion of two additional floors. The project team, in concert with the OLOL team, is utilizing numerous LEED concepts, including a Green Roof System.
The Replacement Hospital will be the epicenter of the OLOL campus, which will additionally include a Cancer Center, Heart Hospital, Ambulatory Surgery Center, Convent, Spa/Fitness Center, and an Outpatient Clinic and Medical Office Building.
Completed: November 4, 2006
Final Contract Amount: $803,088
This project involved the construction of a single story, 5,667 square foot Outpatient Sleep Center. Construction consisted of: site clearing, earthwork, termite control, storm drainage, cement concrete paving, concrete formwork, concrete reinforcement, cast-in-place concrete, rough carpentry, finish carpentry, architectural woodwork, building insulation, asphalt shingles, manufactured roof panels, sheet metal flashing and trim, firestopping, joint sealants, steel doors and frames, flush wood doors, wood windows and doors, finish hardware, glazing, gypsum board assemblies, tile acoustical panel ceilings, resilient flooring, sheet vinyl floor coverings, resilient wall base and accessories, carpet, painting, wall surface protection systems, signs, post and panel mounted signs, fire protection specialties, toilet and bath accessories, horizontal louver blinds and plumbing.
Completed: May, 2002
Final Contract Amount: $513,650
Completed: December, 2005
Final Contract Amount: $25,009,042
The Opelousas General Hospital ER Tower and Parking Garage was completed in early 2006 as part of a $65,000,000 campus upgrade. The parking garage design included a hybrid Tulsa-Dynaspan structure incorporating precast columns and beams with poured-in-place concrete decks.
Completed: March, 2004
Final Contract Amount: $10,930,883
Construction of this hospital consisted of approximately 68,000 sq. ft. included an additional $400,000 owner-generated changes which had no impact to the final completion date. Additionally, Lafayette Specialty Surgery Hospital partnered with neighboring Heart Hospital of Lafayette to share in $2 Million of campus improvements. The calling card of the facility are the eight state of the art operating rooms which are 920 sq. ft. in area. Additionally twenty private patient rooms provide a warm environment for recovery.
Completed: December, 1995
Final Contract Amount: $10,059,676
The project consisted of a 157,000 sq. ft. ambulatory care center addition to an existing hospital facility. The three story, steel superstructure is supported by caisson foundations. The facility is linked to both the Main Hospital, Surgery Wing Building, and the Cabrini Doctor's Building. As part of the project, an additional 10,000 sq. ft. of the existing Main Hospital Surgery Wing was renovated.
Completed: May, 2003
Final Contract Amount: $3,903,513
Completed: April, 1998
Final Contract Amount: $13,581,978
The project scope involved the construction of a new 39,000 sq. ft. two story Health Promotion Center, 101,000 sq. ft. five story medical office building, five story 350 car parking garage, and a new facilities power plant. These facilities are linked together to the main hospital by an elevated connector. This major expansion on a congested hospital campus in conjunction with the power house and re-routing of critical systems required that our team partner with the Owner at every phase of the construction cycle.